Workplace charging
Banks of networked Level 2 units with access control and usage reporting. We handle the trenching, the conduit and the utility service coordination.
Level 2 home chargers installed by licensed electricians, wired to run on your solar and sized so you never think about charging again.
Almost every complication in a home charger install traces back to your main electrical panel. Its capacity, its age, and how much of it your air conditioner already claims. We start there, which is why our quotes don't change on installation day.
| Level | Circuit | Range added per hour | Good for |
|---|---|---|---|
| Level 1 | 120 V, standard outlet | 3–5 miles | Plug-in hybrids and low-mileage drivers who park 12+ hours a night |
| Level 2 at 32 A | 240 V, 40 A circuit | ~25 miles | Most households. Fills a typical daily commute in under two hours. |
| Level 2 at 48 A | 240 V, 60 A circuit | ~37–44 miles | Two-EV households, large-battery trucks and SUVs, short overnight windows |
| DC fast | Three-phase commercial service | 150–600 miles | Commercial and fleet sites only, not a residential product |
Honest advice: most people who buy a 48 A charger would never notice a 32 A one. The faster unit matters when your panel can support it anyway or you have two cars sharing one circuit.
Banks of networked Level 2 units with access control and usage reporting. We handle the trenching, the conduit and the utility service coordination.
Shared-circuit designs and per-unit metering so residents pay for their own energy without the HOA becoming an accidental utility.
Load studies, phased build-outs and storage-backed designs that keep depot charging from detonating your monthly demand charge.
For Level 2 charging, yes. A standard 120 V outlet (Level 1) adds roughly 3–5 miles of range per hour, which works if you drive under 40 miles a day and park overnight. Level 2 on a 240 V circuit adds 25–44 miles per hour and turns charging into a non-event. Most installs are a 50 or 60 A circuit from your main panel.
Three options, cheapest first. A load-management device lets the charger share an existing circuit and back off when the dryer runs, often $400–$700 and no panel work. A tandem breaker or sub-panel handles many cases. A full 200 A service upgrade runs $2,500–$5,000 and is genuinely necessary less often than people are told.
Functionally yes, and we wire for it. Your array feeds the whole house; if the car is charging while the sun is up, that's solar electricity going into the battery. Some chargers and inverters go further and modulate charging rate to match surplus production, so you only pull from the grid when you must. Tell us you drive an EV and we'll size the array with those extra 3,000–5,000 kWh a year in it.
We install hardware you choose, and we'll tell you what we'd put in our own garage. We commonly fit Tesla Wall Connector, Enphase IQ EV Charger, ChargePoint Home Flex, Emporia and Wallbox. What matters more than brand is that it's UL-listed, hardwired rather than plug-in for outdoor installs, and has a real warranty path.
A straightforward garage install is three to five hours. Long conduit runs, detached garages, outdoor-rated installs and panel upgrades push it to a full day or two. We quote from photos of your panel and the intended charger location, so the price you're given is the price you pay.
Yes, workplace and multifamily Level 2 banks, and DC fast-charging site prep in partnership with the network operators. Commercial charging lives or dies on demand charges, so we model it against your utility tariff exactly the way we model a solar array, and we usually recommend storage alongside.
Send a photo of your electrical panel and where you want the charger. We’ll come back with a fixed price that includes the permit, the inspection and the load calculation.
Your project is reviewed by a person, not routed to a lead marketplace.